I went to the wood waste place and discovered that the smallest amount they'll sell you is 1/2 yard. I asked the guy to go light when filling the truck (he did), so of course it fell short of how much I needed when I got home.
A little low |
I had to go back the next day and get another 1/2 yard which got the pathway to the level I wanted.
Better |
Next up: adding drainage to the berm in the form of gravel or chicken grit, based on Loree's instructions (thank you Loree!), getting more plants in, and figuring out a way to mulch the agaves with gravel or stone while mulching everything else with fine bark mulch. Any bright ideas out there? I think I need some sort of border to divide the two mulches but I don't think bender board is going to cut it in this case.
I think I might have to build a rock wall/perimeter where the red line is. So much for avoiding the purchase of stone right now.